Background Information for Standards of Performance: Coal Preparation Plants, Volume 3: Supplemental Information, Final.
powered by 
This report is issued in connection with final promulgation of regulations for standards of performance for new and modified coal preparation plants. This document supplements information presented in two earlier background documents (EPA450/2-74-021 a and b). This report contains a reevaluation of the standards for thermal dryers, a summary of undated control costs, a discussion of the inflationary effects of these control costs, and a projection of the annual power consumption increases required by the standards. It also contains a discussion of changes in the opacity standards for coal preparation plants.
Descriptors: | Standards of performance; Coal preparation plants; Control costs |
Date:
Reference #: | 1976
A.76.10 |
Availability: | Yes |
EPA Office: | Office of Air and Radiation |
Office Suboffice: | Emission Standards and Engineering Division/Office Air and Waste Management |
Office Division: | Office of Air Quality Planning and Standards |
EPA Author: | |
Document Type: | Background Cost-Related Document |
Contractors: | |
Document Status: | Final |
Pages: | 62 |